X

hspcb.gov.in HWM Authorization Renewal Haryana : Hazardous Waste Management

Organisation : Haryana State Pollution Control Board
Service Name : H.W.M. Authorization Renewal Hazardous Waste Management
Applicable States/ UTs : Haryana
Home Page : https://www.hspcb.org.in/
Details Here : https://www.hspcb.org.in/

HSPCB HWM Authorization Renewal

Please follow the below Procedure for obtaining authorization under Hazardous and other Wastes

Related : HSPCB Renewal/Extension of Consent to Establish : www.statusin.in/37283.html

Procedure

1. Every occupier of the facility who is engaged in handling, generation, collection, storage, packaging, transportation, use, treatment, processing, recycling, recovery, pre-processing, co-processing, utilization, offering for sale, transfer or disposal of the hazardous wastes and other wastes shall be required to make an application in Form 1 on the online portal of Haryana State Pollution Control Board or on the portal of HEPC

2. No processing fee is required to be deposited for obtaining the authorization.
3. Checklist of documents required for renewal of authorization, is given at Annexure-B

4. The validity of authorization will be 5 years.
5. The timelines and process for deciding the application for renewal of authorization will be same as prescribed in procedure for grant of 1st authorization.

6. Inspection of the industry is carried out by the authorized officer/ officers of the Board after receipt of application for authorization, after getting approval from the Competent Authority, to check the status regarding installation of arrangements made by the unit at site for handling and management of Hazardous and Other Wastes and compliance of the conditions imposed in the previous authorization granting to the unit.

7. In case the unit is involved in recycling/utilization of Hazardous wastes/other wastes, then the application in that case is submitted on hard copy separately for grant of specific authorization and passbook, to procure the raw material, for recycling/utilization of Hazardous wastes/other wastes.

In such cases inspection is carried out by two officers of the Board i.e. Regional Officer and Concerned field officer and are forwarded to Head Office within 15 days and are decided presently at the level of Chairman.

Related Post

8. The authorization is renewed only for those units which are complying the requirements prescribed in the HOWM Rules, 2016 and procedure laid down their under and submitted all required documents.

H.W.M. Authorization

1. Every occupier of the facility who is engaged in handling, generation, collection, storage, packaging, transportation, use, treatment, processing, recycling, recovery, pre-processing, co-processing, utilization, offering for sale, transfer or disposal of the hazardous wastes and other wastes shall be required to make an application in Form 1 on the online portal of Haryana State Pollution Control Board or on the portal of HEPC

2. No processing fee is required to be deposited for obtaining the authorization.
3. Checklist of documents required for obtaining First/New authorization, is given at Annexure-A

4. The validity of authorization will be 5 years.
5. The units can operate their projects only after obtaining prior authorization.

6. The application for authorization (except for recycling and utilization of Hazardous/other Wastes) for the projects/industries having investment more than Rs. 10 crore and involving CLU cases of more than 1 acre land, can be submitted on the portal of HEPC as well as on the portal of HSPCB, at present.

7. The application received on HEPC portal are marked to the Nodal Officer deputed by the Board with HEPC for processing and deciding the same as per procedure laid down by the Board which are forwarded through online system to the concerned Regional Officer for scrutiny and verification.

The applications applied on the portal of the Board, are directly received in the portal of Regional Officer concerned.
8. Regional Officer mark the application further to the concerned field officer for scrutiny, verification and recommendation.

9. Inspection of the industry is carried out by the authorized officer/ officers of the Board before commissioning of the production in the unit and before giving the 1st authorization, after getting approval from the Competent Authority, to check the status regarding installation of arrangements made by the unit at site for handling and management of Hazardous and Other Wastes, before deciding the cases of 1st authorization.

Tags: hspcb.gov.in
www.statusin.in © 2022 Contact Us   Privacy Policy   Site Map