You are here: Home > Maharashtra
All posts from

mahafireservice.gov.in e-Fire Approval Online Application : Maharashtra Fire Services

Organisation : Maharashtra Fire Services (MFS)
Service Name : Online Application of e-Fire Approval
Applicable State: Maharashtra
Website : mahafireservice [dot] gov [dot] in

Sponsored Links:
Want to ask a question / comment on this post?
Go to bottom of this page.

How To Apply For MFS e-Fire Approval?

Online Application of Maharashtra Fire Services (MFS) e-Fire Approval

Related / Similar Facility : Mumbai Traffic Police Vehicle Registration

Just follow the simple steps mentioned below to apply for Fire Approval online.

Sponsored Links:

Steps:
Step-1 : http://online.mahafireservice.gov.in/
Step-2 : Fill the registration form


Step-3 : Then login to apply online.

Documents Required For MFS e-Fire Approval

Documents Required for Obtaining MFS Fire Approval or Provisional No-Objection Certificate

1. Application shall be addressed to “ The Director Maharashtra Fire & Emergency Services-Mumbai ”

2. Application from the Individual/Company/ Society on letterhead duly stamped and signed by authorized signatory or the Architect/ Civil Engineers appointed by the company along with authorization letter issued by the company. It should also indicate detailed address of site and the Development Control Rules made applicable for proposed development i.e. Municipal Corporation, Municipal Councils, and nearest fire service available.

3. Two set of all architectural drawings in metric system which should include Block Plan, Typical Floor Plan, Section & Elevation Plan etc. and floor wise area calculation certificate duly signed by Architect/ Civil Engineer.(Including free of FSI areas like basement, underground tanks, under ground solvent storage areas etc.) If the drawing are already approved by any competent authority such as Town Planning etc, the One Set of True Copy to be enclosed.

4. Brief Note on Activities to be carried out in the building. If it is a Industrial or storage building then the Process flow chart of the plant duly certified by authorized person on his/her letterhead should be submitted.

5. Brief Note on the Fire Prevention and Protection measures in case of existing building, one set of drawings of the existing fire protection arrangements should be submitted.

6. Block Plan of building should be given with the details such as width of the main road on which plot is located, activities of the adjacent plots, width of main entrance, other entrance to the plot, Basement if any, Details of the activity carried out in Basement, Marginal spaces, approach roads around the building, and other details for industrial activities like transformer yard, utility block, raw material & finish goods storage, tank farm area, storage of hazardous gases, liquids etc, for e.g. LPG, “A”, “B” and “C”- class petroleum products, LDO etc.

7. In case of industry the list of raw material (including Consumable Materials like LPG Cylinders, Storage Qty for Diesel Generators etc) and finished goods with their quantity, their storage place in the plant should be marked on block plan.

8. Details of Centralized Air Conditioning System, Provision of Fire Dampers, Ventilation systems etc., If

9. If handling, processed or storage of any materials which requires permission from Govt. Agencies then, Copies of approvals taken from Govt. agencies like Chief Controller of Explosives (CCE), Excise Deptt. Gas Authority, MPCB, DISH, FDA, etc. In case of high rise building falling around airport, NOC from Civil Aviation Authority is required.

10. If the building is in existence and has obtained Occupancy Certificate then, Fire Approval and occupancy certificate issued by concern planning authority, copy of the same should be submitted. The set of approved drawings shall be submitted.

11. Copy of Registration and License of the company/ society should be submitted.

12. The Architect/ Civil Engineer shall certify that the plans of proposed construction are confirming with the development control rules of concern competent authority and or provisions of NBC – 2005.

13. Fire Protection Fund Fees Receipt. (This shall be issued by the Director’s Office after first submission of file)

14. Provisional NOC issued within 7 working days after receipt of online payment UTR Number.

Contact

For Technical Support Please Call – 1800212005599

FAQ On MFS e-Fire Approval

Here are some frequently asked questions (FAQ) about MFS e-Fire Approval:

What is MFS e-Fire Approval?
MFS e-Fire Approval is an online system that allows individuals and businesses to apply for fire safety clearance from the Maharashtra Fire Services (MFS). The system was launched in 2018 to make the fire safety clearance process more efficient and convenient.

Who can apply for MFS e-Fire Approval?
Any individual or business that is planning to construct a new building or make changes to an existing building that could affect fire safety can apply for MFS e-Fire Approval.

How do I apply for MFS e-Fire Approval?
To apply for MFS e-Fire Approval, you can visit the MFS website and fill out an online application form. You will need to upload the required documents along with your application form.

How long does it take to get MFS e-Fire Approval?
The time it takes to get MFS e-Fire Approval varies depending on the workload of the MFS office and the complexity of the project. However, in general, it can take anywhere from a few weeks to a few months to get MFS e-Fire Approval.

Additional Simplified Procedure

To apply for MFS e-Fire Approval, you can follow these steps:
1) Go to the MFS website: https://mahafireservice.gov.in/.
2) Click on the “e-Fire Approval” tab.
3) Select the “Apply Now” option.
4) You will need to provide the following information:
** Your name
** Your email address
** Your phone number
** The address of the property where you want to apply for fire approval
** The type of building you want to apply for fire approval for
** The purpose of the building
5) You will also need to upload the following documents:
** A copy of your Aadhaar card
** A copy of your PAN card
** A copy of your property tax receipt
** A copy of your building plan
6) Click on the “Submit” button.

Your application for MFS e-Fire Approval will be processed and you will be notified of the outcome within a few days.

3 Comments
Add a Comment
  1. Dear Sir,
    We want to apply NOC for Change of Fuel , our Factory is at Taloja Ind Estate presently we are using HSD and want to convert on Natural Gas As MGL has approached us for the Connection.
    Kindly let us know the Process

  2. G G Fire Engineering Technology Private Limited Pune
    Requirement :- Fire Licence Renewal Form :- N

  3. Dear sir
    I am willing to construct the industrial shade(for making corrugated box) measuring 377 Sqm. in industrial area. The total plot area is 876 Sqm with 13.50 metre & 12.00 Metre wide roads to two sides. And for other two sides 3.00 M setback distance is provided.
    As per NBC the provisions of Part 4 The fire & life safety are applicable to to, industrial, buildings have floor area more than 500 m2 on any one or more floors. So please inform me that is NOC from fire department is necessary or not. If NOC is required to be taken then please give me details about the required setback distance from plot boundary to be provided.
    Thanking you

    S.J.Bhandugare

Leave a Reply

How to add comment : 1) Type your comment below. 2) Type your name. 3) Post comment.

www.statusin.in © 2021 Contact Us   Privacy Policy   Site Map
Status Check, Procedures, Facilities